Planning a transportation center that includes construction and urban development above metro stations and in their urban surroundings.
With the aim of improving the convenience of using the information systems and taking advantage of the opportunity to strengthen high-density construction and an intensive mix of uses.
Major challenges in the project:
• Combining all means of transportation with a ticket and minimal walking distances.
• Connecting heavy rail platforms 1-4 to the planned platforms 5+6.
• Integration in urban planning trends.
• Construction over the Netivey Ayalon, the Ammunition Hill Bridge and railroads without stopping traffic and changing the infrastructure.